Yondr — Building A & B

Hyperscale data centre

Client / Developer

Yondr Group

Main Contractor

ISG

MEP Contractor

Jones Engineering (Mechanical, Electrical & Plumbing)

Project Type

Hyperscale Data Centre

Capacity

30 MW per Building, 60 MW Combined

Status

Project overview

Precision from start to finish

FR Plumbing & Heating delivered the supply of materials, labour and installation for the plumbing package across Yondr Buildings A & B, working as part of the wider MEP delivery team led by Jones Engineering.

Our scope covered the installation of drainage, copper domestic-water services and risers, specialist RO water services for humidification systems, condensate drainage serving FCUs and AHUs, water heaters and second-fix plumbing installations throughout the facilities.

The project required a high level of coordination and workmanship within a mission-critical data-centre environment, with all installed systems tested and completed in accordance with the project requirements.

Selected work

Built with precision.

01

Drainage + Rainwater Systems

  • Installation of rainwater drainage stacks throughout the buildings.
  • Installation of drainage stacks for condensate discharge from mechanical units.
02

Domestic Services (Copper Pipework)

  • Installation of copper pipework for hot and cold-water services.
  • Services supplied to offices, bathrooms, breakout rooms and all facility areas.
03

Tank Room & Distribution Domestic

  • Installation of copper risers throughout the buildings.
  • Full distribution pipework to serve all levels and areas.
04

RO WATER SERVICES

  • Installation of Reverse Osmosis (RO) water services for humidification systems.
  • These systems provide moisture to the air to counteract the dry conditions created by the heat output of generators.
  • Installation of all associated pipework and connections.
05

TESTING & INSPECTION

  • Installation of condensate drainage systems for Fan Coil Units (FCUs) and Air Handling Units (AHUs).
  • Ensuring correct falls, discharge and connections.
06

Sanitary Ware

  • Testing of all installed systems including pressure testing and leak testing.
  • All systems checked prior to completion and handover to the commissioning team.
07

Final fix & handovers

  • Supply and installation of water heaters.
  • Installation of all associated plumbing connections and services.