Yondr — Building C

Hyperscale data centre

Client / Developer

Yondr Group

Main Contractor

Collen

MEP Contractor

Jones Engineering (Mechanical, Electrical & Plumbing)

Project Type

Hyperscale Data Centre

Capacity

40 MW

Status

Project overview

Precision from start to finish

FR Plumbing & Heating was responsible for the supply of materials, labour and installation for the full plumbing package at Yondr Building C, the third phase of the Yondr London Campus, a 40 MW hyperscale data centre.

Our scope included drainage systems, copper pipework, RO water services for humidification, condensate drainage for FCUs and AHUs, water heaters, second fix installations and comprehensive testing of all systems.

All works were completed to the highest standards within a mission-critical environment, ensuring quality, safety and performance.

Selected work

Built with precision.

01

Drainage + Rainwater System

  • Installation of rainwater drainage stacks throughout the building.
  • Installation of drainage stacks for condensate discharge from mechanical units.
02

Domestic Services (Copper Pipework)

  • Installation of copper pipework for hot and cold-water services.
  • Services supplied to offices, breakout rooms, bathrooms and all facility areas.
03

Tank Room & Distribution Domestic

  • Installation of copper risers throughout the building.
  • Full distribution pipework to serve all levels and areas.
04

RO WATER SERVICES

  • Installation of Reverse Osmosis (RO) water services for humidification systems.
  • Providing moisture to counteract dry conditions created by the heat output of generators.
  • Installation of all associated pipework and connections.
05

TESTING & INSPECTION

  • Installation of condensate drainage systems for Fan Coil Units (FCUs) and Air Handling Units (AHUs).
  • Ensuring correct falls, isolation traps and connections.
06

Sanitary Ware

  • Testing of all installed systems including pressure testing and leak testing.
  • All systems checked prior to completion and handover to the commissioning team.
07

Final fix & handovers

  • Supply and installation of all water heaters.
  • Associated plumbing and connections installed to serve all facilities.